Article How Do You Set Up A Horizontal Sawmill for Hardwood?
Use the following commissioning sequence before regular production:1. Prepare the site. Provide a firm, level base with enough space for logs, boards, maintenance, and safe operatormovement.2. Align the track and bed. Check rail level, spacing, parallelism, and carriage movement.